Make it step by step
- Step 01
Choose an authorised level site outside runoff routes and beneath no dead branches. Practise in calm weather; never dig tent trenches.
- Step 02
Lay out the tarp. Pad the two poles at reinforced high-edge points without puncturing the fabric. Attach outward-facing lines to each support.
- Step 03
Have a helper hold poles while you secure front and side lines. Lower and anchor the back edge to create a continuous slope.
- Step 04
Adjust one point at a time to remove water-catching dips. Inspect lines and sprinkle a little water from outside before use.
Check before use
Water runs off the low edge, poles stand steadily and lines are visible outside walkways.
Limits of this project
Not shelter from storms, lightning or flash floods. No fire or stove beneath the tarp.
Take down and restore
Support poles before releasing lines. Dry and fold the tarp, remove stakes and pack everything.
All lashings and racks here are for light objects, never people, climbing or rescue.
Further reading
References support relevant principles, not certification of these projects or their dimensions. These original practice designs and diagrams have not been field-tested by this website.

